Why Does a Trailer Concrete Pump Lose Pumping Pressure?

2026-11-06 16:57:30

When working on the construction site, trailer concrete pumps often encounter various pressure-related abnormal phenomena. Some equipment just starts pumping and everything is normal. After a period of operation, the pressure slowly drops.

There are also no problems with the no-load operation of the equipment. Once a load is applied, the hydraulic pressure will not reach the working value specified in the equipment manual. In another situation, the sound of the whole machine is normal, but the actual concrete output is significantly reduced. What’s more tricky is that the pressure gauge reading continues to rise, but no concrete is discharged from the delivery pipeline.

When encountering these phenomena, many on-site operators’ first reaction is to determine that the hydraulic pump is damaged, and they directly arrange to replace the parts. But not all the actual faults come from the hydraulic pump. Pressure abnormalities can be roughly divided into three categories: insufficient pressure supply of the hydraulic system itself, leakage inside the concrete pumping mechanism, and excessive overall resistance of the conveying pipeline. Only by distinguishing these three types of problems can we avoid unnecessary maintenance work.

How to Identify the Cause of Abnormal Pumping Pressure

There is no need to disassemble the equipment immediately on the site. The scope of failure can be narrowed by relying on the symptoms observed during operation. You can make a preliminary judgment according to the symptom table below. It is only used to identify the general troubleshooting direction. The specific faults need to be confirmed by subsequent inspection and testing.

Fault symptom Potential fault direction
The reading of the hydraulic pressure gauge is low when working under load There is a problem with the hydraulic pump body or pressure control components
After the equipment runs for a period of time, the pressure gradually decreases The temperature of the hydraulic oil is too high, or the internal leakage of the components increases with the temperature
The hydraulic pressure reading is normal, but the concrete discharge is weak S-valve-related seals and concrete pistons are worn, or the S-valve swing mechanism does not reach its correct position
The pressure rises rapidly, and the concrete completely stops discharging The pipeline is blocked, and the overall conveying resistance increases sharply
The longer the conveying distance, the more difficult the pumping becomes The actual pumping capacity of the equipment is insufficient, or the pipeline layout creates additional resistance
S-valve switching is slow, and the pressure drops significantly during switching The accumulator nitrogen precharge pressure is insufficient, or the swing cylinder system fails

Multiple symptoms may also occur on the same machine. For example, a partially blocked pipeline will not only increase the pressure, but also be accompanied by intermittent discharge, which should be comprehensively considered in combination with the actual working conditions of the site.

Hydraulic System-Related Faults

The hydraulic system is the power source of the whole set of equipment. If this system cannot establish and stabilize the working pressure, the subsequent concrete pumping operation will naturally be affected.

Hydraulic Pump Wear Resulting in Internal Leakage

The internal parts of the hydraulic pump will wear out after long-term operation, which directly reduces the volumetric efficiency. When the equipment is operating without a load, the impact of wear is not easy to detect.

When the concrete is pumped and the load increases, the problem of internal leakage will be exposed. Part of the hydraulic oil leaks internally within the pump, and the output pressure and flow cannot keep up with the operating requirements, and the system pressure cannot be sustained.

If you want to confirm this, you can’t judge by just listening to the sound. According to the requirements of the equipment manual, the pressure and flow data should be read under the specified working conditions, and compared with the factory parameters to determine the actual state of the hydraulic pump.

Relief Valve Malfunction

The relief valve is responsible for limiting the maximum working pressure of the whole hydraulic system. If the pressure parameters of the valve are adjusted incorrectly, or the valve core is stuck with impurities and cannot be completely closed, the valve may open prematurely.

The hydraulic oil will flow through the relief valve before it reaches the target pressure. Even if other parts are intact, the whole system cannot meet the working pressure required for construction.

If such a problem occurs, do not directly increase the pressure of the relief valve. First, inspect the valve for foreign matter and whether the spring is deformed, and confirm the working state of the control element itself. Raising the relief pressure at will will also bring the risk of overload damage to other parts.

Excessive Hydraulic Oil Temperature

If you work continuously for a long time, the temperature of hydraulic oil will gradually rise. After the oil temperature rises, the viscosity of the oil decreases, and the amount of internal leakage at the gaps of each hydraulic component will increase.

Many construction sites will encounter machines that work smoothly when cold. After the equipment heats up, the pumping capacity will deteriorate significantly, which may be related to this factor.

In this kind of situation, check the hydraulic oil temperature reading first. Then check whether the cooling fan and radiator are blocked with dust. At the same time, observe whether the hydraulic oil is emulsified or deteriorated, and whether the oil level is within a reasonable range.

Insufficient Accumulator Nitrogen Precharge Pressure

The S-valve switching system of many trailer concrete pumps uses an accumulator to provide additional hydraulic flow during switching. The nitrogen precharge pressure of the accumulator may gradually decrease during long-term operation.

The most intuitive manifestation of insufficient nitrogen pressure is that the S-valve switching becomes slow and the impact sound of switching becomes louder. At the moment of each S-valve switching, the system pressure may suddenly drop sharply.

Many people will attribute this phenomenon to the failure of the main hydraulic pump. However, the pressure output capacity of the main pump itself may be intact, but the accumulator cannot provide enough hydraulic flow in an instant to complete the switching. During overhaul, the accumulator nitrogen precharge pressure should be tested according to the given value in the equipment manual. If the pressure does not meet the standard, it should be recharged with nitrogen according to the specifications by qualified personnel. It cannot be compensated directly by increasing the system pressure.

Wear and Leakage of the Concrete Pumping Mechanism

There are many cases where all the pressure parameters measured by the hydraulic system are normal, but the concrete can’t be delivered. In this case, the problem is not the hydraulic circuit, but the sealing failure of the pumping mechanism on the concrete side. The high-pressure concrete flows back inside the mechanism, and pumping efficiency is reduced.

Cutting Ring and Wear Plate Wear

The S-valve is sealed by fitting the cutting ring and the wear plate to each other. As the sand and stone continue to abrade the surfaces, the contact surfaces of the two parts will slowly develop grooves, and the sealing gap will become larger.

During pumping, the high-pressure concrete will flow back into the hopper along the gap formed by wear. The hydraulic power is not effectively used to push concrete outward, which is manifested as weak output.

On a daily basis, you can observe the backflow inside the hopper. After shutdown and safe isolation, check the depth of the wear grooves of the two fitting surfaces to determine whether the components need to be replaced.

Concrete Piston and Delivery Cylinder Wear

There is a sealing ring on the outside of the concrete piston, which moves back and forth inside the cylinder to push concrete. After the sealing ring is worn out, the sealing effect decreases.

When pushing concrete, some mortar and concrete slurry may leak past the piston into the water box. If the inner wall of the delivery cylinder is scored, it will further aggravate the leakage.

The simple judgment method on the spot is to observe the water box. If a large amount of slurry appears frequently in the water box, it may indicate that the piston or delivery cylinder seal has failed. Then inspect the components to further confirm the degree of wear of the piston and cylinder wall.

S-Valve Swing Mechanism and Swing Cylinder Pressure Abnormalities

The normal pressure reading of the main hydraulic system does not necessarily mean that the S-valve can complete its switching movement. Insufficient hydraulic pressure supplied to the swing cylinder and swing bearing wear or jamming will cause the S-valve to fail to reach its correct position, leaving the flow passage partially obstructed.

This state may not produce obvious material backflow, but the flow channel is partially blocked, which will increase conveying resistance. The pressure gauge reading rises, and the actual concrete discharge flow becomes smaller, which is easy to mistake for pipe blockage.

When overhauling, don’t just focus on the cutting ring and the wear plate. You can check whether the S-valve reaches its correct end position and aligns with the delivery cylinder opening during each switching movement. At the same time, check the actual working pressure of the swing cylinder, and check whether the swing bearing has excessive clearance or restricted movement.

This part is only for mechanical leakage and switching failure on the concrete side. The internal leakage of the hydraulic circuit is a separate fault, and should be diagnosed independently.

Excessive Conveying Resistance and Pipeline Blockage

The problems of pipelines and concrete materials themselves will not necessarily cause the hydraulic system to lose pressure, but will make the system require higher pressure to complete the conveying. Many people will mistakenly think that the pressure of the equipment is insufficient. In fact, the pressure required by the working conditions may have exceeded the available pumping pressure of the current equipment.

Pipeline Layout and Conveying Distance

If the horizontal conveying distance is too long, or the vertical upward pumping height is too high, it will increase the required pumping pressure. If the selected pipe diameter is too small, it will also increase the resistance.

If there are too many elbows, hose connections, or sharp bends in the pipeline, additional resistance will accumulate. Even if the equipment and accessories are intact, poor pipeline arrangement will cause pumping difficulties.

Concrete Mix Properties

The properties of the concrete itself have a great impact on the difficulty of pumping. The slump is inappropriate, the workability is poor, and the pumping resistance will rise directly.

The aggregate particle size is too large or the grading is unsuitable, which will also increase the conveying resistance. The proportion of mortar is not enough, an adequate lubrication layer cannot form, and the coarse aggregate is easy to get stuck. When concrete segregates, it is also easy to cause pumping difficulties.

Pipeline Blockage

The residual concrete on the inner wall of the pipeline may harden and clump over time if it is not cleaned out. These lumps will narrow the pipeline diameter, and in severe cases, they will directly cause local or complete blockage.

After a pipe becomes blocked, the conveying resistance may rise sharply. The pressure gauge reading continues to rise, but there is almost no concrete outflow from the outlet.

Pressure gauge fluctuations and outlet discharge conditions can help identify a possible blockage. It should be noted that this kind of failure is caused by increased resistance, not pressure loss of the hydraulic system. Do not adjust the pressure parameters of the hydraulic system to compensate for a blockage.

On-Site Troubleshooting Steps for Insufficient Pumping Pressure

After clarifying the various causes of failures, step-by-step inspections can be carried out according to the actual on-site symptoms. The following steps can be used as a reference. In case of special working conditions, the order of inspection can also be adjusted.

Important reminder: Before disassembling pipelines or hydraulic components, follow the equipment manufacturer’s requirements. Shut down and isolate the machine, lock out the power source, and safely release residual pressure before carrying out maintenance to avoid safety risks.

Step Inspection item Purpose
1 Read the pressure gauge of the hydraulic system and compare it with the working parameters specified by the equipment Confirm whether there is a pressure abnormality in the hydraulic system itself, and pay attention to the instantaneous pressure fluctuation during switching
2 Check the temperature of hydraulic oil, check the whole set of pressure control components and the nitrogen precharge pressure of the accumulator Narrow down the scope of internal failures of the hydraulic system, and troubleshoot insufficient hydraulic assistance during switching
3 Check the sealing components of the S-valve and whether the S-valve switches fully, and check the condition of the concrete piston and swing cylinder Confirm whether there is internal leakage or abnormal switching of the concrete pumping mechanism
4 Evaluate the pipeline layout and check the concrete mix properties Judge whether the failure phenomenon is caused by excessive pumping resistance
5 According to the pressure gauge and discharge performance, check for pipeline blockage Locate the possible blockage of the conveying pipeline

If you directly disassemble and replace major components without identifying the fault, it is easy to replace intact components, which will increase unnecessary maintenance costs.

Summary

Pumping pressure abnormalities in a trailer concrete pump generally fall into three main categories. First, the hydraulic system cannot establish or maintain the pressure required for the operation, which also includes the switching failure caused by insufficient nitrogen precharge pressure of the accumulator; second, the seals of the concrete pumping mechanism are worn, causing internal concrete backflow, or the S-valve swing mechanism fails to move the valve into position; third, the pipeline layout or concrete mix creates excessive conveying resistance.

During on-site maintenance, first observe the symptoms of the equipment, clearly distinguish which type of problem it belongs to, and then check accordingly. Do not replace the hydraulic pump simply because pumping becomes difficult. In many cases, the problem is in the sealing components, S-valve swing mechanism, accumulator, pipeline or concrete mix. Only by finding the real fault point can we efficiently solve the pumping problem at the construction site.